Email the LMS Project Manager Yale University Library Yale University Front Door Yale Info

multicolored block representing Orbis catalogYale University Library

Library Management System Migration
Voyager Implementation

Yale Library's current Library Management System, Orbis , was installed in 1989. The Library Management System Migration (LMS) project is a thirty-month endeavor to replace Orbis with the next generation library catalog. In March 2001, following a rigorous evaluation process involving several vendors, Endeavor's Voyager system was selected as the new LMS (Orbis2), with a projected implementation date of July 2002.

Orbis2 Training & Documentation

Training

Training At A Glance

Training Calendar

Training Registration

Other Training Documentation

 

Orbis2 Final Report

Production Migration

Voyager Release 2001.1 Highlights *

Voyager Rel 2001.1 Features *

Final Conversion Schedule (rev. 7/9/02)

Interim Workflows
24 June - 15 July

Final Item Type List (5/14)

Final Location+Loancode mapping table (5/14)

Punch List (5/14)

Implementation Schedule

Final NOTIS/ORBIS loads and batch jobs

Orbis2 Search Forms and Canned Searches

 

 

 

 

 

 

 

*password protected

  Vendor News

Activity Reports

Working Groups

Electronic Journals

Selection Process

 

 

Documentation

Orbis2 Training Manuals

Orbis2 Acq, Cat, Circ & WebVoyage

Acquisition Memos

Cataloging Memos

Circulation Memos

 

Workstations & Servers Hardware

Voyager Clients
(Loading Instructions)

Workstation Issues

Photos of the Orbis2 Hardware

Min. requirements for Orbis2 Workstations

 

System Configuration & Enhancements

Locations

Enhancement Requirements

Voyager Enhancements for Yale*

 

Data Migration

Current Data Migration Status

Production Migration Statistics

Data Migration Documents


© 2001 Yale University Library
Last modified: 04 September 2002
Send comments about this Web page to Library Administrative Services
This file is located at http://www.library.yale.edu/orbis2/implementation/orbis2.html