Phase 2a Renovation Project Visual History, Yale University Library
image
Phase 2 Renovations

 

Preparing the nave for the fall semester


Furniture and equipment are brought back to prepare
the areas in the nave for the start of the new semester

 

 

The ITS computer cluster from the Cross Campus Library
is returning to the nave for this academic year

 

As the equipment is put into place, electricians continue
to install wiring and data lines around the base of the
built in cabinets

 

Movers from the Meyer Moving Company are unloading
returned equipment for the relocated ITS computer
cluster

 

The first alcove will offer an area to experiment with
furniture configurations and use of space for collaborative teaching and learning. It will open with the Smart Board
relocated from Cross Campus Library and tables configured
for lecture or seminar seating. Computers will not be
installed, but wireless and electric connections will be
available for use of laptops

 

For added safety, a temporary second exit has
been added in the far end alcove of the Linonia &
Brothers (L&B) Reading Room

 

Temporary stairs into the Selin Courtyard will assist
egress from the L&B if the secondary exit is needed
in an emergency

 

Brick has arrived that will be used to face the interior
Cross Campus Library pillars

 

 

 


   Return to the top of this page.
   Return to the Phase 2a Renovations Homepage.
   
Return to Yale University Library Homepage.


 bottom quick links
© 2006 Yale University Library 3/20/07
Send comments about this site to
Library Administration
Phase 2a Renovations Copyright Project Overview Fact Sheet photos Donor News & Information Responses
Search this site Yale University YaleInfo Contact Us Orbis Library Catalog Library hours