Phase 2a Renovation Project Visual History, Yale University Library
image
Phase 2 Renovations
 
Finishing work continues, especially on the Cross Campus Library
glass walls and Pavilion

 

Remaining work inside Sterling Memorial Library
includes finishing the skylight and roof of the
new staircase, as well as step treads and hand
railings. But the carved stone walls are in place.

 

Work also continues to complete the Room 2 extension
offices for Access Services in the Sterling Memorial
Library basement.

 

In the public area of the Sterling Memorial Library
basement, tiles are laid for the border of the reading
room.

 

A worker inserts spacers as he lays stone tiles in a
pattern at the tunnel-side entrance to the reading room
in the Sterling Memorial basement.

 

A large new air fan has been installed in the redesigned
mechanical space behind the Sterling Memorial Library
basement group study rooms.

 

At the Cross Campus Library entry from Sterling Memorial
Library, the framing for a frieze of custom-made decorative
tiles has been installed.

 

A long view of the concourse level shows the
computer counters of the Circulation desk on
the right and the central staircase on the left.

 

Low built-in shelves will line the central stairwell on the
concourse level of Cross Campus Library.

 

See next page


 

   
   Return to the top of this page.
   Return to the Phase 2a Renovations Homepage.
   
Return to Yale University Library Homepage.


 bottom quick links
© 2008 Yale University Library
This file last modified 8/29/07
Send comments about this site to
Library Administration
Phase 2a Renovations Copyright Project Overview Fact Sheet photos Donor News & Information Responses
Search this site Yale University YaleInfo Contact Us Orbis Library Catalog Library hours