Week of June 12, 2006: Preparations for the Renovation Continue.

A container has been built in the Sterling Memorial Library (SML) nave to seal dust and reduce noise during the demolition of the staircase.

From within the containment for the staircase, a glimpse of the nave captures the last views from the stairs.

Shelving and posters have been removed from the Cross Campus Library (CCL).

Excess shelving are stacked in the CCL courtyard prior to being removed from the construction site.
|