|
Preparing to move collections and for the Bass
Library opening

The
temporary Cross Campus Library Computer Clusters
in the Sterling Memorial Library nave also will be
disassembled.
Lynna
Jackson, ITS begins to remove computers from
the temporary Cross Campus Library Computer Cluster.

Workers
are proud to patch the nave floor with new
stone where over a staircase existed.

The
work requires careful matching of stone.

Tom
Strong (Strong Cohen Graphic Designers)
brings more signs to post in the new library.
|